35027 PORT LINEBringing the stock of the Up Bournemouth Belle into Bournemouth Central in June 1966.
Built at Eastleigh she entered traffic in December 1948, was rebuilt in May 1957 and withdrawn in September 1966, 18 years in all and only 9 rebuilt.
She is still with us on the Swanage Railway and super she looks too.
Picture added on 20 July 2010 at 09:41